Skip to Main Content Area
Home
GME
  • Home
  • Faculty & Staff
  • Education
  • Publications
    • Textbooks
    • PhD theses
    • Structural optimization
    • Studies and structure reports
    • Visualization and advanced design
    • User manuals
    • Fluid-structure interaction
    • Courses and conferences documentation
  • Initiatives
    • ERA 2000
      • Presentation
      • General description of the proposal
      • Bridge over A Coruña estuary
      • Bridge over Ares estuary
      • Bridge over Ferrol estuary
      • Recently constructed bridges
        • Akashi Kaikyo bridge
        • Connection over Gran Bælt strait
        • Bridge over Corinto strait between Rion and Antirion
      • Bridges under project
        • Bridge over Messina strait
        • Bridge over the mouth of Tokyo bay
        • Bridge over the mouth of Ise bay
        • Bridge over Kitan strait
        • Bridge over Ho-yo strait
        • Bridge over Tsugaru strait
        • Bridge over Fehmarn strait
    • ICARO Award
      • Presentation
      • 2011
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
  • R & D
    • Conferences
    • Courses
    • Software
      • In-home codes
      • Available
      • Texts with applications
    • Publishing activities
      • Textbooks
      • Research texts
      • Studies and structure reports
    • Research facilities
    • Research fields
    • Experience in analysis and design
    • Projects
  • Sponsors
  • Links
  • Job opportunities

Geometric nonlinearity and material

Linear and non-linear structural analyses of a factory constructed of double layered brick

Año de comienzo del proyecto: 
2002
Financiado por: 
TEDECO
  • R&D projects with public institution and/or company
  • Geometric nonlinearity and material
  • Historical building

Non-linear analysis of a prefabricated concrete housing

Año de comienzo del proyecto: 
2002
Financiado por: 
TEDECO
  • R&D projects with public institution and/or company
  • Geometric nonlinearity and material
  • Building

Consulting work on prefabricated concrete warehouse piers warping

Año de comienzo del proyecto: 
2004
Financiado por: 
Prefabricados Castelo S.A.
  • R&D projects with public institution and/or company
  • Geometric nonlinearity and material
  • Industrial construction

Non-linear analyses of rib 19 of the AIRBUS 380 wing

Año de comienzo del proyecto: 
2004
Financiado por: 
AIRBUS
  • R&D projects with public institution and/or company
  • Geometric nonlinearity and material
  • Aircrafts

Global Optimum design of discrete structures in linear and non-linear problems: Parametric and sensitivity analyses

Año de comienzo del proyecto: 
1994
Financiado por: 
CICYT
  • National or region research projects
  • Geometric nonlinearity and material
  • Structure optimization
  • « first
  • ‹ previous
  • 1
  • 2
Syndicate content

Languages

  • English English
  • Español Español

User login

  • Request new password

© Structural Mechanics Group 1992-2010

ETS Ingenieros de Caminos, Canales y Puertos | University of A Coruña

Contact | Statistics

Powered by Drupal, an open source content management system